High speed winch has light weight, compact structure, simple operation and high efficiency. It is great choice for light duty and frequent work with requirements of high speed.
Our company, a professional winch manufacturer in China, designs and produces winches for sale, such as mining winch, double drum winch, piling winch, industrial friction winch. These winches can be designed with customized service, and produced according to national standards.

AQ-JK Light Duty Winch
Loading capacity: 0.5~60 t;
Wire rope capacity: 20~500 m;
Working speed: 20~35 m/min; (single/dual speed)
Power supply: 220-690V,50/60HZ,3Phase;
Except for winches, we also have other industrial devices, such as overhead crane, gantry crane, jib crane, electric hoist, steel structure, marine travel lift, automated vertical car parking system, electric car parking system. If you are interested, just send inquiry to sales@crane.pk

AQ-JK Light Duty Winch
Loading capacity: 0.5~60 t;
Wire rope capacity: 20~500 m;
Working speed: 20~35 m/min; (single/dual speed)
Power supply: 220-690V,50/60HZ,3Phase;
High speed winch for sale
Portable construction high speed winch is follow-operated by people on the ground, also can be used in the room, or operated with wireless type with far way. Except for exclusive-use, the winch can match-use with electric trolley and plain trolley, geared trolley. These trolleys have simple structure, light weight, easy load and unload.

1. This high speed electric winch is mainly used for materials lifting, weight drops pulling and drawing in construction.
2. It is also used as main hoisting equipment in crane.
3. It is the special winch of derrick and gantry frame and lifting trolley.
4. It is suitable for lifting material and equipment installation of construction, mine site and factory.

Pay attention to installation position of the winch:
(1)Drainage must be unblocked around the installation position of the winch and a working shed should be set up;
(2)The installation position of the winch shall enable the operator to see clearly the commanding personnel and the lifting or dragging objects. The horizontal distance from the winch to the installation position of the components should be greater than the installation height of the components, that is, when the components are hoisted to the installation position, the elevation Angle of operator’s line of sight should be less than 45°;

(3)The guide pulley should be set in front of the winch, and the distance between the guide pulley and the reel axis should be no less than 15 times of the width of the reel, that is, no more than 2°, and the slotless reel should be no more than 20 times of the width of the reel, so as to avoid excessive wear between the wire rope and the guide pulley groove edge;
(4) The direction of wire rope winding into the drum should be perpendicular to the axis of the drum, and the allowable deviation of its vertical is 6°. This can make the wire rope ring arranged neatly, not oblique winding and mutually overlapping squeeze

Requirements of winch operator
1.Winch operators must be familiar with the performance, structure and operation methods of the machine. Hold the operation certificate issued by labor bureau.
2. Before the operation, check whether the winch anchor, feeding frame is firm, at the same time, check whether the clutch, brake is sensitive and reliable, Whether the transmission device and protective cover including exposed belt and gear are complete.
3.The wire rope shall be arranged neatly. In the process of lifting the sling, at least 3 ~ 5 laps shall be reserved on the reel.
4.The winch shall be used and maintained by a special person, and the grounding line shall be checked regularly, and the foreman shall be reported in time when electric equipment leakage or other faults are found. No unauthorized repair shall be allowed.

5.The hanging basket must be equipped with a safety door, which can only lift materials. Hanging orchid in the air, in addition to the use of brakes, at the same time with the parking rack pad. No one is allowed to walk under the plant across the wire rope.
6.The loading frame must have a good grounding and lightning protection device. Check once a week whether the limiter is flexible and reliable. When lifting heavy objects, bricks and ashes should not exceed 0.5 ton.
7.In the operation of power failure, cut off the power supply. Lower lifting object or plant to ground.
8.Upon completion of operation, the lifting plant or object should be lowered to the ground, and the power should be cut off and the switch box locked.